Satah Full Field Development

The Satah Full Field Development project’s objective is to maximize crude oil production and oil recovery by reducing back pressure at the wellheads and introduce gas-injection and gas-lift facilities. The project scope involves offshore brownfield works to the existing wellhead platforms and production manifold platform, installation of infield pipelines, as well as modifications and installation of new facilities at the Onshore Satah plant at Zirku Island.

Chemical Injection Skids and a gas dehydration unit for Zadco and Technip in the United Arab Emirates

Project Info

End user

Zadco (Zakum Development Company)

Contractor

Technip / NPCC

Location

United Arab Emirates

Year of Supply

2013

Satah Full Field Development scope of supply

  • Gas Dehydration Unit
  • 3 Chemical Injection skids. 2 skids were installed off-shore, 1 skid on-shore. All skids were executed with SS 316L tank
  • SS tubing for the main process lines and multiple injection points.