L10 Platform

GDF Suez has extracted gas from block L10 in the Dutch sector of the North Sea since 1975. On the production platform, the gas is dried, i.e. freed of water to a dew point of 4ºC in order to make it suitable for transport onshore. Via the assembly platform in block L10, the dried gas, together with gas condensate, is transported to shore via a 178 km long pipe.
 

Project gallery

Project Info

End user

GDF Suez E&P Nederland BV

Contractor

GDF Suez E&P Nederland BV

Location

Offshore, The Netherlands

Year of Supply

2011

L10 Platform scope of Supply

  • 2 Actuators Algas 18C-9600-835
  • 1 Actuator Algas 14C-8300-735 c/w pneumatic control box
  • 1 Hydraulic power pack