Badra Oil Field Development

In February 2012 Petrofac was awarded the lump-sum EPC contract by Gazprom Neft for the first phase of the Badra Oilfield Development Project. The Badra Oil Field, that is situated 160 km southeast of Baghdad City in the Republic of Iraq will be developed by the central processing facility (CPF), which comprises three crude oil processing trains. The first phase of the project is expected to come on stream in the second half of 2013, with final completion scheduled during the second half of 2015.

Crude oil processing in Iraq

Project Info

End user

Gazprom Neft Badra

Contractor

Petrofac Onshore Engineering & Construction

Location

Iraq

Year of Supply

2013

Badra Oil Field Development scope of supply

  • Process Design of the Electrostatic Coalescers
  • 3 x 2  sets of Electrostatic Coalescer Internals, Incl. Transformers and Local Indicating Panels
  • 6 Emulsifying Devices
  • Process internals (Alloy 825) for 1st stage (3x), Phase Separators (3x) & 2nd stage 3 Phase Separators (3x):
    • FAVID
    • Vanepack
    • Demister
    • Calming Baffle