B13 Platform

The B13 field is located in block B13 approximately 260 kilometers north of Den Helder and is the second stage of Chevron’s multi-phase development of shallow gas fields in the A&B blocks of the Dutch part of the Continental Shelf. The development of the B13 field included the installation of a platform in block B13, a pipeline connecting the B13 platform to the A12 Central Processing Platform and 4 development wells. The gas from the B13 field will, together with gas from the A12 field, be transported to Den Helder through the A6-F3 and NOGAT pipelines.

 

Fuel Gas Treatment Package for Offshore Dutch Sector

Project Info

End user

Chevron Exploration and Production Netherlands B.V.

Contractor

HSM Steel Structures B.V.

Location

The Netherlands, Offshore

Year of Supply

2010

Scope of Supply B13 Platform Chevron
  • 1x Fuel Gas Package